Delegation from the French Development Agency (AFD) works with Dien Bien provincial Leaders on the Nam Rom River Disaster Risk Management Project
On the morning of May 19, a delegation from the French Development Agency (AFD), led by Mr. Olivier Gilard, Project Manager of the Water Supply and Sanitation Division at AFD Headquarters, conducted a business trip, field inspection, and working session with leaders of Dien Bien Province regarding the implementation of the Nam Rom River Basin Multi-Disaster Management Project aimed at protecting local communities, adapting to climate change, and promoting socio-economic development in the province. Accompanying the delegation were Mr. Hugo Pierrel, Deputy Director of the AFD Hanoi Office, along with project officers and relevant experts.
Receiving and working with the delegation on behalf of Dien Bien Province were Comrade Lo Van Cuong, Member of the Provincial Party Standing Committee and Standing Vice Chairman of the Provincial People’s Committee, together with leaders of relevant departments and agencies.

At the meeting, Comrade Lo Van Cuong, Standing Vice Chairman of the Provincial People’s Committee, provided an overview of the province’s outstanding achievements in investment attraction since the beginning of the year. Accordingly, the province successfully organized many major festivals and events such as the Ban Flower Festival, the 2026 Investment Promotion Conference, and the groundbreaking ceremonies of several key projects.
At the Investment Promotion Conference held on May 11, Dien Bien Province granted 12 investment approval decisions and investment registration certificates to 11 investors with a total registered capital exceeding VND 48.320 trillion. Among these were three foreign-invested projects with a total investment capital of more than VND 14 trillion. In addition, 22 memoranda of understanding on investment cooperation were signed with a total committed capital exceeding VND 209.370 trillion.
Notably, on May 20, the province will continue organizing the groundbreaking ceremony for the Son La – Dien Bien – Tay Trang Border Gate Expressway project, which is expected to create momentum for socio-economic development and strengthen regional connectivity.

Regarding the Nam Rom River Basin Multi-Disaster Management Project, to date the project has approved compensation and support plans for 85.28 hectares, reaching 96.5%; while the handed-over site area has reached 83.38 hectares, equivalent to 94% of the approved plan.
In terms of construction, the embankment renovation section from the existing diversion dam to Thanh Binh Bridge has been completed with numerous components such as electrical systems, railings, stone-paved walkways, connecting bridges, resting steps, observation huts, dredging works, and motorcycle crossings over the dam.
For the newly constructed embankment section, the implemented value is estimated at VND 495 billion out of the total contract value of VND 658.862 billion, equivalent to 75.13%.
During the meeting, Mr. Olivier Gilard highly appreciated Dien Bien Province’s strong determination in land clearance and project progress acceleration. Compared to previous inspections, site clearance work has shown many positive developments, while construction components are being implemented urgently to ensure the planned schedule.
He also discussed with the province the implementation process of the Sai Luong Reservoir Project in Muong Mun Commune. The AFD representative expressed gratitude for Dien Bien Province’s active coordination and support during the project survey and research process. This project has highly specialized characteristics; therefore, both sides have agreed on optimal technical solutions to ensure construction safety.
Currently, the project has been approved by AFD, and the draft financing proposal has been submitted to the Ministry of Finance. AFD requested the province to continue coordinating and working with relevant ministries and sectors to complete procedures promptly, ensuring the signing and implementation schedule of the project between the two sides. In the coming period, AFD will continue conducting in-depth working sessions with Dien Bien Province regarding this matter.

Speaking at the meeting, Standing Vice Chairman Lo Van Cuong affirmed that Dien Bien Province is focusing intensively on land clearance and accelerating the construction progress of the Nam Rom River Basin Multi-Disaster Management Project. The province will continue coordinating closely with AFD to effectively implement the commitments agreed upon by both sides.
Regarding the Sai Luong Reservoir Project, Comrade Lo Van Cuong emphasized that this is a necessary project receiving strong support from local residents. In the coming time, Dien Bien Province will continue active cooperation with AFD while strengthening coordination with central ministries and agencies to finalize documents and procedures, ensuring the project is implemented on schedule.